Malta

Institutes

  • MU, Malta 
    • Memorandum of Understanding signed on 03 May 2016
    • Addendum signed on 12 December 2016
      • The scope of this collaboration is to provide inputs for the optimisation of the tunnel infrastructure, including shielded locations, by establishing network requirements for wireless communication in the tunnel environment and by performing a feasibility study of wireless data transmission for the FCC-hh accelerators systems. In parallel, the institute will contribute to the cost estimate of the infrastructure. 

 

Find more about Malta's relationship with CERN here.